Automated QA/QC · Checklists by a Ph.D., P.E.
Your test data and studies, analyzed and reported with cited findings.
Upload the DGA lab report, power quality recording, or arc flash study you already have. Ohmics reads it against a checklist written by a Ph.D., P.E. and returns findings that each cite the page they came from. It also reviews arc flash labels, NEC drawings, coordination studies, MOPs, and OLPD reports. Reports are typically delivered within 1 hour, longer when demand is high.
- Number of reviews
- 8
- Reviews, each with its own checklist
- Total checklist items across all products
- 454
- Checklist points, each tied to a cited source
- Document retention
- 30 days
- Files kept for 30 days, then deleted unless you remove them sooner
Transformer DGA Analysis
Two units, 16 samples, 2 labs
Critical
Two transformers gave near-identical results on the same day
Source: lab report 1, both units, same sample date
Significant
Fault gas jump not repeated by a second lab
Source: lab report 1 and lab report 2, unit 1 history
Observation
High oxygen in a nitrogen-blanketed unit
Source: unit 2 history, O2 and N2 columns
8 reviews
Start from what you have.
I have test results
Transformer DGA Analysis
Every sample trended, screened for contamination, and run through Rogers, Key Gas, Duval triangle and pentagon, and energy-index methods, with recommendations and next steps.
Free first DGA report · From $149Start →
Power Quality Analysis
Raw meter recordings or meter software PDF reports checked against IEEE 519 (1992 and 2014), IEEE 1159, IEEE 1453 and ANSI C84.1, with the key graphs, an interpretation and plain findings.
$349Start →
OLPD Report Review
Methodology and consistency review of your PD survey report. It does not give a condition call.
From $199Start →
I have a study or drawings
Arc Flash Study Review
A structured second look at your incident-energy study before it becomes a label.
From $149Start →
Label & PPE Boundary Review
Cross-check what your labels say against what your study says.
Free single-label cross-check · From $99Start →
NEC Focused Drawing Pre-Check
A structured pass over your drawings before the plan checker sees them.
From $49Start →
Coordination & Selectivity Review
Flags protection settings that need verification. It does not give a selectivity verdict.
From $199Start →
Method of Procedure (MOP) Review
Structural completeness and cross-document consistency. It does not give a go/no-go.
From $199Start →
Transformer DGA
Your DGA history, across labs, under the 2019 and 2008 editions of IEEE C57.104.
Each sample gets its 2019 DGA status and its 2008 condition. Suspect samples are flagged, not hidden. Your first report is free.
Power quality
Your meter recordings, checked against IEEE 519 and IEEE 1159.
Upload raw recordings from supported Fluke and PMI meters, or the PDF report from any meter software. The report checks voltage against ANSI C84.1, voltage THD and current TDD against both the 2014 and 1992 editions of IEEE 519, flicker against IEEE 1453, and each recorded event against IEEE 1159 and the ITIC curve. If your utility commission or tariff sets its own limits, upload the rule and it is checked too.
Arc flash study
A second look at your arc flash study before it becomes a label.
The review reports which IEEE 1584 edition and model your study says it used, whether the equipment falls inside that model's stated range, and which inputs the study leaves undocumented. It does not recalculate anything, and it never calls a study approved.
Editions
Which editions each review uses.
Standards change. Each report names the edition it applied, and this table says which editions each review checks against today.
| Review | Checks against | Note |
|---|---|---|
| Transformer DGA | IEEE C57.104-2019 (default) and C57.104-2008 | The 1991 acetylene limits are available at intake |
| Power quality | IEEE 519-2014 and 519-1992, IEEE 1159, IEEE 1453, ANSI C84.1 | IEEE 519-2022 is not yet included |
| Arc flash study | The IEEE 1584 edition your study says it used, 2002 or 2018 | The review does not recalculate |
How it works
From order to report, in four steps
- 1
Pick a review
Choose a product and enter your page count. The price shows up front.
- 2
Pay and upload
Check out, then upload your file: a PDF, or a raw meter recording for power quality.
- 3
Automated cross-check
Every page is read against a checklist written by a Ph.D., P.E.
- 4
Get your report
Findings ranked by severity, each tied to its page. Typically delivered within 1 hour, longer when demand is high.
Trust & compliance
What you can count on
- Checklists written by a Ph.D., P.E. and IEEE 1584 voting member
- No code text bundled. Every citation comes from your own file
- Price shown before you pay, and never raised without your approval
- Secure upload, malware-scanned, stored 30 days then deleted unless manually removed
- Your files are not used to train AI models unless you opt in in writing
Findings
Findings you can check yourself
Every finding points to the page it came from. We do not quote code from memory, and we never call a study approved.
- 454
- checklist points
- Every
- finding cites a page; unconfirmed citations are dropped
- 0
- studies approved or cleared
Critical · Arc Flash Study Review
One electrode configuration used for every bus
- Checklist item
- AF-ELEC-03
- What to check next
- Assign electrode configuration per bus from the actual equipment and re-run.
Pricing
Start free. Pay per document.
Free check
Freefirst DGA report
Your latest DGA lab report, plus earlier ones if you have them. No card required.
Try it freePer review
No sales call$49and up, by PDF pages
See the price before you pay. Expert review by a licensed P.E. available on select products.
See all pricingHave your next report or study screened.
No setup, no quote. Upload one file and get cited findings back, typically within 1 hour.
