Ohmics — automated preliminary screening. Not a stamped engineering review, not an AHJ determination, and not a substitute for the Engineer of Record. Full disclaimer.

OhmicsAutomated Electrical QA/QC

Automated QA/QC · Checklists by a Ph.D., P.E.

Your test data and studies, analyzed and reported with cited findings.

Upload the DGA lab report, power quality recording, or arc flash study you already have. Ohmics reads it against a checklist written by a Ph.D., P.E. and returns findings that each cite the page they came from. It also reviews arc flash labels, NEC drawings, coordination studies, MOPs, and OLPD reports. Reports are typically delivered within 1 hour, longer when demand is high.

Number of reviews
8
Reviews, each with its own checklist
Total checklist items across all products
454
Checklist points, each tied to a cited source
Document retention
30 days
Files kept for 30 days, then deleted unless you remove them sooner
DGA

Transformer DGA Analysis

Two units, 16 samples, 2 labs

Anonymized sample
  • Critical

    Two transformers gave near-identical results on the same day

    Source: lab report 1, both units, same sample date

  • Significant

    Fault gas jump not repeated by a second lab

    Source: lab report 1 and lab report 2, unit 1 history

  • Observation

    High oxygen in a nitrogen-blanketed unit

    Source: unit 2 history, O2 and N2 columns

40 checklist points · every finding cites its sourceSee the sample report →

Transformer DGA

Your DGA history, across labs, under the 2019 and 2008 editions of IEEE C57.104.

Each sample gets its 2019 DGA status and its 2008 condition. Suspect samples are flagged, not hidden. Your first report is free.

Power quality

Your meter recordings, checked against IEEE 519 and IEEE 1159.

Upload raw recordings from supported Fluke and PMI meters, or the PDF report from any meter software. The report checks voltage against ANSI C84.1, voltage THD and current TDD against both the 2014 and 1992 editions of IEEE 519, flicker against IEEE 1453, and each recorded event against IEEE 1159 and the ITIC curve. If your utility commission or tariff sets its own limits, upload the rule and it is checked too.

Arc flash study

A second look at your arc flash study before it becomes a label.

The review reports which IEEE 1584 edition and model your study says it used, whether the equipment falls inside that model's stated range, and which inputs the study leaves undocumented. It does not recalculate anything, and it never calls a study approved.

Editions

Which editions each review uses.

Standards change. Each report names the edition it applied, and this table says which editions each review checks against today.

ReviewChecks againstNote
Transformer DGAIEEE C57.104-2019 (default) and C57.104-2008The 1991 acetylene limits are available at intake
Power qualityIEEE 519-2014 and 519-1992, IEEE 1159, IEEE 1453, ANSI C84.1IEEE 519-2022 is not yet included
Arc flash studyThe IEEE 1584 edition your study says it used, 2002 or 2018The review does not recalculate

How it works

From order to report, in four steps

  1. 1

    Pick a review

    Choose a product and enter your page count. The price shows up front.

  2. 2

    Pay and upload

    Check out, then upload your file: a PDF, or a raw meter recording for power quality.

  3. 3

    Automated cross-check

    Every page is read against a checklist written by a Ph.D., P.E.

  4. 4

    Get your report

    Findings ranked by severity, each tied to its page. Typically delivered within 1 hour, longer when demand is high.

Trust & compliance

What you can count on

  • Checklists written by a Ph.D., P.E. and IEEE 1584 voting member
  • No code text bundled. Every citation comes from your own file
  • Price shown before you pay, and never raised without your approval
  • Secure upload, malware-scanned, stored 30 days then deleted unless manually removed
  • Your files are not used to train AI models unless you opt in in writing

Findings

Findings you can check yourself

Every finding points to the page it came from. We do not quote code from memory, and we never call a study approved.

454
checklist points
Every
finding cites a page; unconfirmed citations are dropped
0
studies approved or cleared

Critical · Arc Flash Study Review

One electrode configuration used for every bus
Checklist item
AF-ELEC-03
What to check next
Assign electrode configuration per bus from the actual equipment and re-run.
Source: Appendix F, Incident Energy Report, Electrode Config columnAnonymized sample finding. See more sample findings →
See a report before you order.Seven anonymized samples from pre-launch test documents: transformer DGA, power quality, arc flash study, labels, NEC drawings, coordination, and MOP.Sample reports →Read before you upload.Articles on reading DGA results, partial discharge reports, and arc flash studies, each citing the editions it was written against.All articles →

Pricing

Start free. Pay per document.

Free check

Freefirst DGA report

Your latest DGA lab report, plus earlier ones if you have them. No card required.

Try it free

Per review

No sales call

$49and up, by PDF pages

See the price before you pay. Expert review by a licensed P.E. available on select products.

See all pricing
Compare it to your own first passEvery product against what your engineer's hours cost, at your rate and your pace.

Have your next report or study screened.

No setup, no quote. Upload one file and get cited findings back, typically within 1 hour.

Start your first review →

This site uses Google Analytics to see how visitors use it and which of our ads lead to orders. Nothing loads unless you accept. It never sees your uploaded documents, email address, or intake-form answers. See the Privacy Policy.